Your Journey

You are here

Construction begins

Step 6 of 10Construction AwarenessNext: Pre-drywall

Follow the build in the order it actually happens.

Permits are issued and your home is being built.

What matters right now

Your job now is documentation and timing — know which milestone is next and be ready before walls close.

Three things to focus on 

Three questions to ask

  • What is the next milestone, and when should I expect it?
  • Who do I contact when I see something on site, and how should I send it?
  • When will the home be at pre-drywall so my inspector can be scheduled?

Three things to check

  • Framing looks square and plumb, with no obvious damaged or replaced members left unaddressed.
  • The site is protected from water: sheathing taped, openings covered, drainage away from the foundation.
  • Your selections match what is being installed, room by room.

One common mistake

Skipping the pre-drywall walkthroughOnce drywall closes, problems behind it get expensive to reach.

Recommended next step

Mark where the home is and see what to verify at each milestone.

Track your build on the timeline

Finished with this stage?

Ask New Construction Intelligence™

What are you deciding right now?

Guided by NCI content — stages, checklists, mistakes, and decision paths. Educational guidance, not inspection, legal, engineering, or lending advice.

Test Drive covers three decisions today. More paths are being authored stage by stage.

Checklist

Construction-start questions

Get the schedule, the inspection policy, and your single point of contact in writing before framing.

0 of 5 complete0%

Schedule and access

Quality and inspections

5 items left before you can mark this reviewed.

Decisions that matter now

  • Decide now whether you will hire your own inspector

    Independent inspections must be scheduled before drywall, not after.

    Read the full explanation

Mistakes to avoid

  • Waiting for updates instead of asking for the schedule
  • Assuming municipal inspections cover quality

Million Dollar Mistakes™ here

All mistakes

Where the build is

  1. Before the buildPermitsPlans and selections are locked, then submitted for approval.2–10 weeks
  2. StructureFoundationGrading, forms, plumbing under-slab, and the pour.1–3 weeks
  3. StructureFramingWalls, floors, and the roof structure are built.2–5 weeks
  4. StructureRoofSheathing, underlayment, flashing, and roofing are installed.1–2 weeks
  5. In the wallsMechanicalHVAC ducts, wiring, and plumbing runs are installed in open walls.2–4 weeks
  6. In the wallsInsulationAir sealing and insulation are installed in every cavity, then verified before drywall covers them. This is the last moment the envelope is visible, and the single largest permanent influence on comfort and utility cost.3–7 days
  7. FinishesDrywallBoard is hung, taped, and finished. The walls are now closed.2–3 weeks
  8. FinishesTrimDoors, trim, cabinets, counters, flooring, and fixtures are installed.3–6 weeks

Learn for this stage

What’s next

The pre-drywall walkthrough, your one look inside the walls.

Continue to Pre-drywall