Pick a different walkthrough

You are here

Pre-construction meeting

Before the slab or foundation — plans and selections reviewed with your builder.

What matters right now

This meeting is where the plan you signed is confirmed against what will actually be built — catch mismatches before anything is poured.

Three things to focus on 

Three questions to ask

  • Does the permitted plan include every structural option and rough-in I purchased?
  • What is the schedule from here, and at which milestones may my inspector be on site?
  • How will changes or field decisions be communicated to me in writing?

Three things to check

  • Plan set matches your signed contract: elevation, extensions, openings, garage, baths.
  • Electrical and low-voltage plan shows the outlets, switches, and runs you ordered.
  • Lot orientation, driveway location, and grading match what you were shown.

One common mistake

Signing without your own inspection rightsInspection access and communication expectations are set here, or not at all.

Recommended next step

Know what happens next and what to verify at each stage.

Follow the build milestones

Educational guidance only — not an inspection, legal, engineering, or lending opinion.